Logo do repositório
Tudo no RIUFPA
Documentos
Contato
Sobre
Ajuda
  • Português do Brasil
  • English
  • Español
  • Français
Entrar
Novo usuário? Clique aqui para cadastrar. Esqueceu sua senha?
  1. Início
  2. Pesquisar por Assunto

Navegando por Assunto "Construction delays"

Filtrar resultados informando as primeiras letras
Agora exibindo 1 - 2 de 2
  • Resultados por página
  • Opções de Ordenação
  • Carregando...
    Imagem de Miniatura
    ItemAcesso aberto (Open Access)
    Construction delays: a case study in the Brazilian Amazon
    (Universidade Federal do Pará, 2017-09) MAUÉS, Luiz Mauricio Furtado; SANTANA, Wylliam Bessa; SANTOS, Paulo Cerqueira dos; NEVES, Renato Martins das; DUARTE, André Augusto Azevedo Montenegro
    The construction industry is one of the industrial sectors with the lowest rates of fulfilment of contract deadlines, especially in developing countries. This fact has been the focus of considerable discussions seeking to identify the causes of the delays. The main purpose of this paper is to use factor analysis to identify the factors that are correlated with delay, contemplating exclusively residential real estate projects and using a city in the Brazilian Amazon as a case study. Based on the database from the government agency that authorises constructions in the city of Belém (City Planning Department - Secretaria Municipal de Urbanismo, SEURB) and data from construction companies, the study investigated 274 construction projects from the past 11 years. Factor analysis and work with the variables that can be identified and measured in the initial phase of the project, i.e., during the feasibility study, demonstrate that the physical characteristics of the apartments and the construction project are the primary causes for variations in construction delays; these causes have not yet been reported in the literature. We hope that the results of this study will contribute to more consistent forecasting of construction time, minimising the risk of delays.
  • Carregando...
    Imagem de Miniatura
    ItemAcesso aberto (Open Access)
    Método para identificação, análise e controle dos fatores de atraso de obras na gestão dos projetos de construção: um estudo baseado na metodologia multicritério construtivista de apoio à decisão (MCDA-C).
    (Universidade Federal do Pará, 2023-01-26) CARVALHO, André Brasil de; MAUÉS, Luiz Maurício Furtado; http://lattes.cnpq.br/7497951647889934
    The delay in works is observed globally in civil construction and affects the economy of countries, directly influencing the costs and low quality of works, the occurrence of disputes between the parties and other consequences, such as social issues related to the housing deficit, for instance. Thus, it is essential to identify the causes of work delays to minimize its consequences. In this context, the objective of this work is the elaboration of a method of identification, analysis, and control for the factors of delay of works in the management of construction projects. The research methodology included, first, a systematic review of the literature (RSL); subsequently, a survey was conducted, through questionnaires and interviews, to observe the most frequent causes of work delay, which were also evaluated for their correlations by the statistical technique of factor analysis. In this case, the results showed that the 12 main causes identified are correlated with four factors of delay of works: supply management, labor management, project management and management of weather conditions. Finally, after this first phase of the research and aiming at the development of the proposed model, the Design Science Research (DSR) method was applied in a local project management company, using as a research tool the multicriteria constructivist methodology of decision support (MCDA-C), seeking to carefully examine the decision-making process related to the delay factors observed; that were used as initial parameters in the structuring stage of the MCDA-C method. The results generated were the development and validation of the proposed method, identified as an artifact generated by the DSR, as well as the elaboration of descriptors (performance indicators) for all causes of delay evaluated. Similarly, control recommendations were obtained in the institution's performance in the factors of work delay in question, mainly regarding the management of supplies and project management that did not present satisfactory performances. In this case, it is worth mentioning the changes that occurred in the organization chart and work methodology of thecompany as actions implemented as a result of the process, carried out jointly with the decision-taker. It is concluded, therefore, that the research allowed an in-depth analysis of which issues should be prioritized in the strategies of actions aimed at minimizing the occurrence of delays in the execution of projects in civil construction and that the delay factors identified can be considered as "management deficiencies" of the enterprises.
Logo do RepositórioLogo do Repositório
Nossas Redes:

DSpace software copyright © 2002-2025 LYRASIS

  • Configurações de Cookies
  • Política de Privacidade
  • Termos de Uso
  • Entre em Contato
Brasão UFPA