Logo do repositório
Tudo no RIUFPA
Documentos
Contato
Sobre
Ajuda
  • Português do Brasil
  • English
  • Español
  • Français
Entrar
Novo usuário? Clique aqui para cadastrar. Esqueceu sua senha?
  1. Início
  2. Pesquisar por Assunto

Navegando por Assunto "Multiphysics analysis"

Filtrar resultados informando as primeiras letras
Agora exibindo 1 - 1 de 1
  • Resultados por página
  • Opções de Ordenação
  • Carregando...
    Imagem de Miniatura
    ItemAcesso aberto (Open Access)
    Análises multifísica via método de elementos finitos para o auxílio à manutenção preditiva em transformadores de potência.
    (Universidade Federal do Pará, 2018-09-21) SOUSA, Antonio Roniel Marques de; NUNES, Marcus Vinícius Alves; http://lattes.cnpq.br/9533143193581447
    The National Interconnected System (NIS) is an organ of fundamental importance in the Brazilian panorama. Its function is to electrically connect generating centers and consumer centers, whether they are business, commercial or residential. The main equipment responsible for the connection and transmission of electric power from the generating centers to the consumers are the power transformers. This equipment is subject to several types of faults that can affect its components, in some cases compromising the operation of this equipment, and consequently the supply of electric energy. In this work, a multiphysical analysis is performed on power transformers, coupling thermal and structural electromagnetic simulations with the objective of providing the operator with information about the ideal moment for performing predictive maintenance, avoiding unplanned shutdowns. For this, computational simulations using the Finite Element Method (FEM) were used and from this, we analyzed the different situations that these equipments can be submitted, in the nominal condition, as well as extreme conditions of operation like current of inrush and current short-circuit. In this perspective, analyzes of the effects that the thermal expansion and the axial forces and radia exerted contributing to possible defects in these equipments were carried out. As a study object, the simulations were performed in a 50 MVA single-phase transformer, which is an equipment that is in operation in the northern region of the country. For a more validation of the methodology used in this work the simulations were validated with real measurement data and with results present in current literature. In this way, this work presents a methodology that can help the technical framework of an industry in the decision of the appropriate moment of stop in a power transformer for the accomplishment of predictive maintenance.
Logo do RepositórioLogo do Repositório
Nossas Redes:

DSpace software copyright © 2002-2025 LYRASIS

  • Configurações de Cookies
  • Política de Privacidade
  • Termos de Uso
  • Entre em Contato
Brasão UFPA