Please use this identifier to cite or link to this item: https://repositorio.ufpa.br/jspui/handle/2011/3516
metadata.dc.type: Dissertação
Issue Date: 22-Jan-2013
metadata.dc.creator: BORDALO, Rosa Helena Coutinho
metadata.dc.contributor.advisor1: LIMA, Adalberto da Cruz
Title: Construção fragmentada: uma análise gerencial dos processos construtivos do complexo de prédios do Instituto de Educação Matemática e Científica (IEMCI) da UFPA
Other Titles: Fragmented construction: a managerial analysis of the construction processes of the building complex of the Institute of Mathematics and Scientific Education (IEMCI) at UFPA
Citation: BORDALO, Rosa Helena Coutinho. Construção fragmentada: uma análise gerencial dos processos construtivos do complexo de prédios do Instituto de Educação Matemática e Científica (IEMCI) da UFPA. Orientador: Adalberto Cruz Lima, 2013. 116 f. Dissertação (Mestrado em Engenharia Civil) - Programa de Pós-Graduação em Engenharia Civil, Instituto de Tecnologia, Universidade Federal do Pará, Belém, 2013. Disponível em: http://repositorio.ufpa.br/jspui/handle/2011/3516. Acesso em:.
metadata.dc.description.resumo: Nos últimos anos, a Universidade Federal do Pará (UFPA), entre outras providências importantes, tem investido significativamente na reestruturação e expansão de seus campi, com a construção de novos prédios, ampliação e reforma dos já existentes. Como na maioria das IFES, porém, na UFPA não existe estrutura e tempo suficientes para que a equipe técnica responsável possa gerenciar e executar os projetos executivos, acompanhar e fiscalizar as obras de construção e manutenção. O objetivo deste trabalho é fazer uma análise gerencial dos processos construtivos da UFPA, tomando por base a obra do Complexo de prédios do Instituto de Educação Matemática e Científica (IEMCI) da UFPA, visando à identificação e minimização dos problemas que se apresentaram ao longo de seu fluxo. Para tal, procedeu-se um estudo de caso nos processos administrativos e demais documentos inerentes à construção dos diversos módulos que compõem o Instituto, com o levantamento de dados de todas as obras executadas, e realização de entrevistas, baseadas no modelo de Campos (2011), a todos os envolvidos no processo. Após a análise dos resultados, constatou-se que a falta de planejamento e gerenciamento efetivo dos processos de projeto construtivos produziram vários problemas, entre os quais, projetos incompletos e falhos, levando à construção fragmentada. A obra, executada em várias etapas, custou 35,19% mais, do que se fosse realizada em uma só etapa, integralmente. Quanto ao prazo, esse acréscimo foi maior ainda, chegando a 283%. Concluindo-se que os intervenientes causados pela fragmentação, influenciaram seriamente no prazo e no valor final da obra.
Abstract: In recent years the Federal University of Pará (UFPA), among other important precautions, has invested significantly in the restructuring and expansion of its campi, the construction of new buildings, expansion and renovation of the existing ones. As in most IFES, however, the UFPA has no structure or enough time for the responsible technical crew to manage and develop constructive project execution, monitor and supervise the construction works and maintenance. The objective of this study is to make a management analyze of the construction processes at the UFPA, on the basis of the complex of buildings of the Institute of Mathematics and Science Education (IEMCI), aiming the identification and minimization of the problems presented along its flow. To do so, through a case study of the administrative procedures and other documents related to the construction of the various modules that make up the Institute, with the data collection of all the performed works, and conducting interviews, based on the Campos's model (2011), to everyone involved in the process. After analyzing the results, the conclusion was that a lack of planning and effective management of constructive processes produced several problems, among them, incomplete and flawed projects, leading to fragmented construction. The construction executed through stages cost 35.19% more than if it was performed in one step and in its entirety. And as the term, this increase was even greater, reaching 283%. Concluding that the interveners caused by fragmentation, seriously influenced on the deadline and the final cost of the construction.
Keywords: Projeto
Gestão de Projetos
Construção fragmentada
Projects
Project management
Construction fragmented
metadata.dc.subject.cnpq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL::INSTALACOES PREDIAIS
metadata.dc.publisher.country: Brasil
Publisher: Universidade Federal do Pará
metadata.dc.publisher.initials: UFPA
metadata.dc.publisher.department: Instituto de Tecnologia
metadata.dc.publisher.program: Programa de Pós-Graduação em Engenharia Civil
metadata.dc.rights: Acesso Aberto
Appears in Collections:Dissertações em Engenharia Civil (Mestrado) - PPGEC/ITEC

Files in This Item:
File Description SizeFormat 
Dissertacao_ConstrucaoFragmentadaAnalise.pdf1,78 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons